Skip to collection list Skip to video grid
Skip to collection list Skip to video grid

UMass in Video

John W. Olver Design Building Celebration

Construction is underway on the $52 million Design Building, the new home for all UMass Amherst departments focused on the built environment. With a sustainable wood structure, and flooring designed on campus, the building will open in January 2017.

Read More
Read Less

categories

View more in
UMass in Video

Currently loaded videos are 1 through 15 of 45 total videos.

First page loaded, no previous page available
Load Next Page